Tuesday, 23 October 2018

Interesting problem

I had planned to use 3cm during this evening’s UKAC.  Trying to work G4BAO I was informed that my LO was unlocking. On investigation I found that the 106.500MHz reflock, located in the shack and fed by 10MHz from my Z3801 GPS disciplined source, was responsible. 
I quickly set up my Leo Bodnar dual output GPS disciplined source on 106.500MHz and fed the LO signal up to the masthead transverter. Checking with G3XDY, he reported the signal sounded OK and looked acceptably narrow on the spectrum display.
I may ditch the reflock, as the HS400 it is housed in takes up valuable space in the shack rack. A LB miniGPS would take up much less space in or on the rack. A 1575MHz GPS antenna signal distribution system is beginning to look necessary.

A second problem was confirmed . The 10GHz transverter is definitely down in sensitivity. This could be the dreaded LO ‘dying FET’ syndrome that occurs with the DB6NT G2 transverter when it is left on all the time, as mine is, at masthead. Leaving it on keeps the box warm and I don’t suffer from condensation in the box. Another job......
Sam

Hunter’s moon approaches.

Still testing




Trying blog touch pro

Apparently the original Google Blogger app has now been withdrawn. I am trying a few other apps. This is Blog Touch Pro.

The photo is to check that I can send photos. My previous attempt didn’t allow me to delete the wrong photo!
Fail.....




It looks like it still lives!

Still exploring what is what on here. If all is well the blog will be back. My intention is to continue with comments, observations and information relating to my VHF, UHF and microwave band activities.
If anyone is still checking my blog, please comment so that I know I’m not ‘talking to myself’!

Sam

Back again

I am exploring whether my Blogspot blog is still operative. Let’s see what happens before I write much else........ Sam

Thursday, 21 September 2017

Future of this Blog

A number of my blog readers have asked why my later postings have all disappeared?
I tried to remove the whole blog, without success, so I have been gradually removing individual postings. This is a slow process. Not made easier by iPad Blogger 64 bit!

In the meantime, because of so many requests to keep  blogging, I have decided to start a new blog. It will contain the usual eclectic mix of radio and travel related postings.

I have found Blogger to be a most awkward platform, over the years, and no longer fit for my purpose.
I'll keep this one for now but will announce on here when and where the new blog will appear.
My grateful thanks to the Blogger people for the use of their platform and to all those who have been loyal readers. I hope you enjoy the new blog, when it is ready.
Sam

Saturday, 9 March 2013

Elecraft P3 build

Today I bought a P3 kit to go with my Elecraft K3 transceiver.

Up until now I have been using a SDR-IQ and PC with Spectravue to observe signal spectrum and waterfall activity.

However, the 22inch monitor screen was becoming a bit crowded when trying to display spectrum, 'KST, JT65 and VK3UM EME planner all at the same time!

Something had to change. The something was that a decision was made to purchase a P3 and initially view spectrum on its built-in screen. Later, a P3SVGA card will be added together with another large screen monitor dedicated to the P3. The P3SVGA will also enable me to plug in a USB keyboard and operate any of the K3 data modes without needing the use of the PC.
A second advantage of the P3 is that it is better integrated with the K3 than
The SDR-IQ and Spectravue. The ability to see the frequency of both VFO A and B at a glance looks really useful.

The SDR-IQ will be repurposed to be used with my TS2000X and IF output modification at 10.695MHz. When required, it can still be connected to the switched IF output from the P3 in order to measure noise in the continuum mode. Something sadly lacking in the P3 firmware and indispensible for EME cold sky to sun noise measurements.




This picture shows the first stages of assembly of P3 serial number 2555. On the left is the back panel and on the right the front panel with the colour LCD screen and various control buttons and function selection knob.

In all it took me about 90 minutes to assemble the kit. Mostly this was checking everything was supplied, that should be, and then screwing the various ready-assembled cards into the P3 case. There were no surprises and everything fitted perfectly. This was a pleasurable experience and very therapeutic!

As my K3 was built for me ( thanks Dave) I never previously had the pleasure of following the superb Elecraft assembly instruction. I think I can see why these have been favourably likened to Heathkit at its best!

Now that the P3 has been built up it is time to check it out.......

More anon.




73 de Sam



- Posted using BlogPress from my iPad